by Matt DelTurco | May 5, 2023
Case Study: KinetiClean™ - Southeast Combined Cycle CLIENT: Southeast Combined Cycle SERVICE: KinetiClean™ HRSG Cleaning BACKGROUND A gas-fired power facility in the Southeast corner of the U.S. contacted Groome after noticing an increase in backpressure and...
by Kelley Nelson | Sep 21, 2022
Case Study: KinetiClean - NE Combined Cycle CLIENT: NORTHEAST COMBINED CYCLE PLANT BACKGROUND This plant has two SGT6-5000FD3 gas turbines equipped with Vogt HRSGs, in a 2×1 combined cycle configuration. Maintenance and cleaning work to the HRSG tubes was...
by Kelley Nelson | Sep 21, 2022
Case Study: KinetiClean - Routine Use Case Examples For this combined case study example, we look at the outstanding results achieved by two separate locations that each completed routine cleaning with the patented KinetiClean technology. CLIENTS: Midwest Combined...
by Kelley Nelson | Mar 23, 2022
Case Study: KinetiClean - Gulf Coast HRSG CLIENT: WESTERN U.S. HRSG BACKGROUND A power station in the West looked to boost operational efficiency and reduce costs. This power station is comprised of a 2×1 combined cycle system, that includes two GE 7FA.02...
by Kelley Nelson | Mar 23, 2022
Case Study: KinetiClean - Gulf Coast Cogen CLIENT: GULF COAST COGEN BACKGROUND This power plant, commissioned in 1995 and located in Texas, is composed of two GE 7EA.02 combustion turbines and 2 Deltak HRSGs that support the neighboring refinery with process...