Blog

Where to Start

Where to Start

THE WHOLE PLANT IMPERATIVE • PART 10 Nine posts of argument come down to one question: what does the plant look like when somebody finally looks at all of it? This series began with a claim that sounds like heresy in a gas plant: the turbine is not where most of your...

read more
The Business Case

The Business Case

THE WHOLE PLANT IMPERATIVE • PART 9 Every deferral in this series was defensible on its own. That is precisely how the number got this large. Nobody in this series made a bad decision. That is the part worth sitting with. The condenser cleaning slipped because the...

read more
The Gas Turbine Inlet

The Gas Turbine Inlet

THE WHOLE PLANT IMPERATIVE • PART 6 The only system on the plant whose failure gets blamed on something else — usually on the most expensive asset you own. Output is off about two percent. Heat rate has crept. Nobody can point to an event, so the water washes get...

read more
Catalyst Systems and CEMS

Catalyst Systems and CEMS

THE WHOLE PLANT IMPERATIVE • PART 5 The one place on the plant where deferral doesn’t buy you time. It buys you a deadline somebody else sets. The day a notice of violation arrives, the plant is usually running fine. Nothing tripped. Nothing alarmed. Availability for...

read more
Cooling and the Summer Peak

Cooling and the Summer Peak

THE WHOLE PLANT IMPERATIVE • PART 4 The one system that takes its cut without ever tripping a unit, setting an alarm, or generating a line in the outage report. Every other failure on a plant announces itself. A tube leak takes the unit down. A compressor problem...

read more
The HRSG

The HRSG

THE WHOLE PLANT IMPERATIVE • PART 3 No moving parts, a fraction of the attention, and more forced outages to its name than anything else on site. Ask a plant manager to name the riskiest asset on site and you’ll usually hear “the turbine.” Pull five years of...

read more
More Than a Turbine

More Than a Turbine

THE WHOLE PLANT IMPERATIVE • PART 2 Why the best-run plants treat availability as a property of the whole system — and manage it that way. Two combined-cycle plants: same vintage, same OEM equipment, similar staffing. One runs at 96% availability year after year. The...

read more
The Stakes Have Changed

The Stakes Have Changed

THE WHOLE PLANT IMPERATIVE • PART 1 For twenty years, deferring maintenance was a safe bet. On today’s grid, it may be the most expensive one you can make. Start with the worst possible afternoon. It’s the hottest day of the summer, the grid is leaning on every...

read more

Achieve true efficiency with Groome!

GET A QUOTE